Commissioning new system or retrot project is a systematic process of ensuring that all building systems perform interactively according to the design intent, basis of design, contract documents and system operational needs. This is achieved by beginning in the design phase, documenting design intent and continuing through construction, building acceptance and the warranty period with actual verication of performance. APT Commissioning department is headed by high qualied engineers and technicians capable to provide full guarantee of success operation and full support to the client vendors insuring full satisfaction to the clients. APT provides commissioning services that follow a systematic process of ensuring all electrical systems perform interactively according to the design intent and the Owner's operational needs
The work included the overall electrical system supply and installation for the compound including all infrastructure, power network, and light current network. The compound is consisted of 33 Buildings, 4 Villas, Mall, and service building - Borg El Arab Alexandria
View Project ImagesSupply and Install all the electrical system starting from conduit in concrete, power system installation, light current installation along with the Emergency System Generator complete with grounding system to support the building service panel feeding stairs lighting, elevators, and all service electrical and mechanical equipment along with all the cabling system, ATS panels and configurations. the work also included the muffler metal work extension – Alexandria
View Project ImagesSupply and Install Emergency System Generator complete with grounding system to support couple residential apartments along with all the cabling system, ATS panels and configurations. the work also included the muffler metal work extension. The work was performed for EL-Salam Interbuild at Kafr Abdo Building, Janaklies Building
View Project ImagesSupply and Install Emergency System Generator complete with grounding system to support couple residential apartments along with all the cabling system, ATS panels and configurations. the work also included the muffler metal work extension. The work was performed for EL-Salam Interbuild at Kafr Abdo Building, Janaklies Building
View Project ImagesElectrical Supply and Installation. The work included all the electrical supply and installation for the buildings starting from the main panel installation, risers, sockets, elevators feeders, and lighting fixtures
View Project Images• Electrical Supply and Installation. The work included all the electrical supply and installation for the buildings starting from the main panel installation, risers, sockets, elevators feeders, and lighting fixtures
View Project Images• Electrical Supply and Installation. The work included all the electrical supply and installation for the buildings starting from the main panel installation, risers, sockets, elevators feeders, and lighting fixtures
View Project ImagesElectrical Supply and Installation. The work included all the electrical supply and installation for the buildings starting from the main panel installation, risers, sockets, elevators feeders, and lighting fixtures
View Project ImagesThe work included perform all the electrical power system installation for the silos project located at the El Hamam including all power cables installation and terminations, Transformers, Main electrical distribution boards, earting system, control system for the Silos operation, and all the lighting system for the overall project
View Project ImagesSupply and Install all the electrical system starting from conduit in concrete, power system installation.
View Project ImagesThe work included the installation of the new grounding network for all (27) unit substation. Each substation including RMU and step down transformer. The work performed to achieve grounding resistance less than 5 ohm.
View Project ImagesThe work included power survey for the existing condition of the power network, design new emergency power network to backup the critical loads. Supply and install new emergency system and sub panels for the emergency system including the modifications to the existing panels, cable routings, and the installation of the generator set - Alexandria
View Project ImagesThe work included power survey for the existing condition of the power network, design new emergency power network to backup the critical loads. Supply and install new UPS system sub panel for the printing machines including the modifications to the existing panels, cable routings, and the installation of the UPS set - Alexandria
View Project ImagesThe work included all the electrical work installation for the Swift 28 meters speed boats fabricated inside the Egyptian Navy Ras-El Tin Naval Base. The Systems included all the Trays Installation, Power Cables, Panels, Communication cables installations, and boat control systems
View Project ImagesThe work included the electrical work at the Amazon office located at the HSBC building Maadi, and included cable tray installation, power cables, and new setup for the kitchen Equipment